2006 09 Kitchen Remodel |
2006 09 01 Cabinets in Progress 2006 09 07 Demolition, Problems 2006 09 14 Vent and Posts Move I 2006 09 19 Vent and Posts Move II 2006 09 25 Cabinets in Progress 2006 10 10 Cabinets in Progress 2006 10 16 Sheetrock, Lighting 2006 10 20 Paint, Cabinet Layout 2006 10 21 Cabinet Install Day 1 2006 10 22 Cabinet Install Day 2 2006 10 23 Cabinet Install Day 3 |
|
2006 10 31 WaitingWe're now at the point of waiting for the granite counter tops. There are 4 pieces - one on the long wall with the sink, two small pieces next to the range, and one on the cabinet next to the wine cooler. I am hoping these will be here in 9-10 days. We had some issues with the way to cut the stone and how the backsplashes should be made, and I believe those are resolved. The appliances are all in and working except the dishwasher, which has to be connected after the sink is in, which can't go in until the counter is in. The island sink works. The electrical work is done, but some or all of most of the light fixtures have not arrived. There are two pieces of glass that go on the walls, one behind the range, one behind the sink on the opposite wall. They go in after the counters. Two open shelves go on the wall to the right of the wall sink. Some of the drawers also need dividers.There will be paint touchup to be done, the phone and alarm have to be moved back, and then we are done. Done? Did I say done?
|
|||||||||