2006 09 Kitchen Remodel

 

Home

Projects

2006 03 08 Kitchen, Before

2006 09 01 Cabinets in Progress

2006 09 05 Demolition Starts

2006 09 07 Demolition, Problems

2006 09 14 Vent and Posts Move I

2006 09 19 Vent and Posts Move II

2006 09 23 Floor Starts

2006 09 25 Cabinets in Progress

2006 09 25 Tile

2006 09 30 Tile, Structural

2006 10 07 Progress

2006 10 10 Cabinets in Progress

2006 10 12 Sheetrock

2006 10 16 Sheetrock, Lighting

2006 10 20 Paint, Cabinet Layout

2006 10 21 Cabinet Install Day 1

2006 10 22 Cabinet Install Day 2

2006 10 23 Cabinet Install Day 3

2006 10 26 Cabinets, Templates, Appliances

2006 10 31 Waiting

2006 11 22 In Use

2006 12 24 In Use

 

 

2006 10 31 Waiting

We're now at the point of waiting for the granite counter tops. There are 4 pieces - one on the long wall with the sink, two small pieces next to the range, and one on the cabinet next to the wine cooler. I am hoping these will be here in 9-10 days. We had some issues with the way to cut the stone and how the backsplashes should be made, and I believe those are resolved.

The appliances are all in and working except the dishwasher, which has to be connected after the sink is in, which can't go in until the counter is in. The island sink works. The electrical work is done, but some or all of most of the light fixtures have not arrived. There are two pieces of glass that go on the walls, one behind the range, one behind the sink on the opposite wall. They go in after the counters. Two open shelves go on the wall to the right of the wall sink. Some of the drawers also need dividers.There will be paint touchup to be done, the phone and alarm have to be moved back, and then we are done. Done? Did I say done?